§ 12.04.030. Final approval and utility connections denied for noncompliance.
Latest version.
The building inspector shall deny final approval and acceptance and shall refuse to allow final public utility connections to any building or dwelling regulated by this chapter unless curbs, gutters and sidewalks, where required by this chapter, exist or are constructed, or unless money or a bond to guarantee their construction is deposited with the city in a sum equal to the estimated cost of the construction of said improvements, as determined by the building inspector, and providing for such construction within ninety days.
(Ord. 90-69 §4, 1969).